50 · SPEC Kit 292
Total FTE N Minimum Maximum Mean Median Std Dev
Total 7 .05 24.5 7.4 2.0 10.5
Have 5 .05 24.5 5.6 1.0 10.6
Planning 2 3.0 20.5 11.8 11.8 12.8
Student Assistant N=6
#of Staff N Minimum Maximum Mean Median Std Dev
Total 6 2.0 14.0 6.7 6.5 4.6
Have 4 2.0 9.0 5.3 5.0 3.8
Planning 2 5.0 14.0 9.5 9.5 6.4
Total FTE N Minimum Maximum Mean Median Std Dev
Total 6 .08 4.0 2.2 2.5 1.5
Have 4 .08 4.0 2.3 2.5 1.8
Planning 2 1.00 3.0 2.0 2.0 1.4
Other Staff Category N=0
Selected Comments from Respondents
Have an IR
“Five percent of one librarian is dedicated to the repository.”
“Head of Archives involved in IR planning but limited involvement in ETD and LOR pilot projects.”
“Large department with many staff. They are providing supervision for the IR’s programmer analyst, project
staffing for development work, networking, and security and maintains of server, etc.”
“Regular environmental scans of IR use and adoption in higher education promotes use of IR at university
administration level.”
“The total FTE is not static. During times of software adjustment the percentage of FTE can be much higher.
The 5% reflects the amount of time devoted on average in normal times.”
“We are in the planning stages of implementing this aspect of the program. The Total FTE figure above is just
an estimate at this time.”
Planning an IR
“Expect only some staff will be involved in IR.”
“We have only one librarian actually working on metadata.”
Previous Page Next Page